25 Jun
2003
25 Jun
'03
11:01 a.m.
Hi all - As far as I know, all of the outstanding tasks to cut Zope 2.6.2 b3 are complete, and all of the items considered important to get into the 2.7 alpha 1 have been merged. I'd like to plan to make both releases this Friday if possible, so if you know of something that I've missed that still needs to be done (for either release), please let me know ASAP. Thanks! Brian Lloyd brian@zope.com V.P. Engineering 540.361.1716 Zope Corporation http://www.zope.com